<source id="ayasr"></source>
      <source id="ayasr"><tr id="ayasr"></tr></source>

    1. <small id="ayasr"><tbody id="ayasr"></tbody></small>

    2. <small id="ayasr"><tbody id="ayasr"><noframes id="ayasr"></noframes></tbody></small>
      <i id="ayasr"></i>
            1. 99久久久久久_佐山爱隔壁人妻中文字幕_成人h动漫精品一区二区三区_污污污污的网站_来一水AV@lysav

              濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
              新聞
              聯(lián)系我們
              咨詢電話
              15866735826

              聯(lián)系:張經(jīng)理

              手機(jī): 15866735826

              郵箱: 394441862@qq.com

              網(wǎng)址:http://1122567.com/

              地址:山東省濟(jì)南市章丘圣井工業(yè)園

              當(dāng)前位置: 首頁 > 新聞中心 > 常見問題

              基坑圍欄的制作工藝流程是怎樣的?有哪些具體的流程?

              來源:http://1122567.com/   發(fā)布時(shí)間:2022-02-05

               
               
                先篩選材料并采購(盤條、鐵絲、管材)——進(jìn)廠檢驗(yàn)---調(diào)試機(jī)器和網(wǎng)片生產(chǎn)---檢驗(yàn)與大貨的過程檢驗(yàn)---胎具制作、框架下料與焊接---檢驗(yàn)與過程檢驗(yàn)----網(wǎng)片與框架的連(焊)接--檢驗(yàn)與過程檢驗(yàn)---立柱下料、折彎成型、邊耳焊接---檢驗(yàn)與過程檢驗(yàn)---配套安裝檢驗(yàn)---電鍍鋅或熱鍍鋅處理及檢驗(yàn)---浸塑處理及檢驗(yàn)---成品抽檢或全檢檢驗(yàn)---入庫倉儲(chǔ)----運(yùn)輸。
               
                First select materials and purchase(wire rod,iron wire and pipe)-incoming inspection-commissioning machine and mesh production-Inspection and process inspection of large goods-mould production,frame blanking and welding-Inspection and process inspection-connection(welding)between mesh and frame-Inspection and process inspection-column blanking,bending and forming Side lug welding-Inspection and process inspection-supporting installation inspection-electro galvanizing or hot galvanizing treatment and inspection-plastic dipping treatment and inspection-sampling inspection or full inspection of finished products-warehousing-transportation.
                陜西基坑圍欄
               
                Shaanxi foundation pit fence
               
                基坑圍欄電鍍鋅工藝:網(wǎng)片電鍍前的檢驗(yàn)→除銹→水洗→氧化→鍍鋅→鈍化→清洗--晾干→檢驗(yàn)
               
                Electro galvanizing process of foundation pit fence:inspection before mesh electroplating→rust removal→water washing→oxidation→galvanizing→passivation→cleaning-drying→inspection
               
                基坑圍欄熱鍍鋅工藝:網(wǎng)片熱鍍鋅前的檢驗(yàn)→脫脂→水洗→酸洗---水洗→浸注鍍?nèi)芤?rarr;烘干預(yù)熱→熱鍍鋅→整理冷卻→鈍化→漂洗→干燥→檢驗(yàn)
               
                Hot dip galvanizing process of foundation pit fence:inspection before hot dip galvanizing of mesh→degreasing→water washing→Pickling-water washing→dipping plating solution→drying and preheating→hot dip galvanizing→finishing and cooling→passivation→rinsing→drying→inspection
               
                基坑圍欄浸塑工藝:網(wǎng)片浸塑前的檢驗(yàn)—除油打砂—預(yù)熱—浸塑—吊掛入倉—烘干溜平—檢驗(yàn)—成品入庫清點(diǎn)—出庫運(yùn)輸
               
                Plastic dipping process of foundation pit fence:inspection before plastic dipping of mesh-degreasing and sanding-preheating-plastic dipping-hanging and warehousing-drying and smoothing-Inspection-warehousing and counting of finished products-outbound transportation
               
                基坑圍欄網(wǎng)片焊接工藝:采購盤條或鐵絲—-驗(yàn)證材質(zhì)---大拔、冷拔絲經(jīng)的抽檢—-校直截?cái)嗉敖z徑隨時(shí)測量-—調(diào)機(jī)試生產(chǎn)并經(jīng)檢驗(yàn)片網(wǎng)--—批量生產(chǎn)和過程檢驗(yàn)--—網(wǎng)片抽檢
               
                Welding process of foundation pit fence mesh:purchase wire rod or iron wire-verify material-Sampling Inspection of large drawn and cold drawn wire-straightening and cutting and measuring wire diameter at any time-adjust the machine for trial production and pass the inspection mesh-batch production and process inspection-Sampling Inspection of mesh
               
                基坑圍欄網(wǎng)框焊接工藝:采購所需邊框管材—檢驗(yàn)壁厚長度重量—---胎具制作和檢驗(yàn)—下料截?cái)?--焊接邊框—網(wǎng)片與邊框焊接-—網(wǎng)框與立柱結(jié)構(gòu)安裝檢驗(yàn)—批量焊接生產(chǎn)—過程檢驗(yàn)---大貨清點(diǎn)抽檢---半成品清點(diǎn)或倉儲(chǔ)。
               
                Welding process of fence net frame of foundation pit:purchase the required frame pipes-inspect the wall thickness,length and weight-mould production and inspection-blanking and cutting-weld the frame-welding between mesh and frame-installation inspection of net frame and column structure-batch welding production-process inspection-bulk inventory and sampling inspection-inventory or storage of semi-finished products.
               
                基坑圍欄立柱制作工藝:采購所需尺寸的鐵管—檢驗(yàn)壁厚長度重量—胎具制作和檢驗(yàn)----下料截?cái)?mdash;折彎成型---焊接邊耳----立柱邊耳尺寸檢驗(yàn)(或與網(wǎng)框的結(jié)構(gòu)安裝)—批量焊接—過程抽檢—大貨清點(diǎn)或倉儲(chǔ)。
               
                Manufacturing process of foundation pit fence column:purchase of iron pipes of required size-Inspection of wall thickness,length and weight-mould making and inspection-blanking and cutting-bending forming-welding side lug-Inspection of column side lug size(or structural installation with mesh frame)-batch welding-process sampling inspection-Bulk goods counting or storage.
               
                以上的內(nèi)容分享來自于陜西名威裝飾工程有限公司的小編為大家進(jìn)行分享的,如果大家還有其他的相關(guān)疑問的話歡迎給我們進(jìn)行來電!
               
                The above content is shared by Xiaobian from Shaanxi Mingwei Decoration Engineering Co.,Ltd.for you.If you have other relevant questions,please call us!

              99久久久久久_佐山爱隔壁人妻中文字幕_成人h动漫精品一区二区三区_污污污污的网站_来一水AV@lysav

                  <source id="ayasr"></source>
                  <source id="ayasr"><tr id="ayasr"></tr></source>

                1. <small id="ayasr"><tbody id="ayasr"></tbody></small>

                2. <small id="ayasr"><tbody id="ayasr"><noframes id="ayasr"></noframes></tbody></small>
                  <i id="ayasr"></i>
                        1. 揭西县| 岢岚县| 洪湖市| 繁昌县| 济源市| 天全县| 从化市| 嵊泗县| 武城县| 开阳县| 潼南县| 宝清县| 株洲县| 金秀| 龙南县| 宜兰县| 富民县| 黔西| 油尖旺区| 蓝田县| 白河县| 清水河县| 固原市| 大竹县| 醴陵市| 乌鲁木齐县| 颍上县| 酉阳| 鹰潭市| 亚东县| 琼中| 奉贤区| 诸暨市| 江安县| 洛浦县| 天镇县| 晋宁县| 抚州市| 晴隆县| 公主岭市| 施秉县|